AI Governance
Agents in production, a loop with no learning component
79% of enterprises report agents in production and 15% tie that spending to the income statement. Read through the TEAF loop, that gap has a name: Observation and Learning were never implemented.
A survey published on 12 November 2026 among 2,005 executives across seventeen industries gives three figures that have to be read together: 79% of enterprises report AI agents in production, only 15% fully tie that investment to measured effects on the income statement, and on a weighted average 49% of initiatives funded over twenty-four months delivered the expected value.
These results are self-reported, and the definition of an agent "in production" stays broad: we therefore classify them as Observed, not Validated. They are nonetheless clear enough to be read as an architecture diagnosis rather than market commentary.
The diagnosis, component by component
Run through the TEAF loop, the situation these figures describe is always the same. Two components are overdeveloped, two are missing.
- Automation and Execution work. That is what the market delivers: an agent running, connected to systems, producing output.
- Intent was never written. Nobody stated what the agent was meant to change, for whom, and against which measure. That is the direct cause of the 15%: spending cannot be tied to an outcome that was never stated.
- Observation is limited to technical monitoring: the agent responds, latency is fine, cost is known weekly. Nothing measures the business effect.
- Learning does not exist. No decision is revised on the basis of what execution taught, so the arrangement is condemned to repeat its initial hypothesis indefinitely.
An organisation with Automation and Execution but no Intent and no Learning does not have a loop: it has an open chain. It can run for a long time, and that is precisely what makes it expensive, since nothing triggers a reassessment.
What the framework asks for before the first deployment
Three artefacts, none of which requires particular tooling:
- A written Intent per agent. One sentence stating what is to be achieved, for which beneficiary, and a single indicator. Not a technical performance target but a business one: a lead time, a volume, a rework rate.
- An entry in the agent registry, with owner, scope, rights and review date, as described in the agent registry. An agent with no named owner has no Intent, it has a presumed intention.
- A recorded baseline. This is the most neglected artefact, and it cannot be recovered afterwards: if average lead time was not measured before go-live, value will remain an opinion for the whole life of the arrangement.
Observation and Learning, concretely
Observation means measuring the gap between the Intent and what actually happens, not watching servers. Learning means that this gap triggers a decision: extend, correct, or stop. In TEAF, those two components are what turns an automated arrangement into a governed capability, and that is what IVG and IDA measure: the first says whether the intent still holds, the second what the gap has cost.
The important part is the third outcome. An arrangement whose shutdown was never planned will not be shut down, because by the time the question arises, hires, vendor commitments and reputations are leaning on it. The review date is set when it costs nothing, which means beforehand.
If the organisation cannot run the full loop
That is the common case below fifty people, and the framework's answer is not to wait for maturity. The 1-1-1 principle of TEAF Light is enough to close the chain: one Intent, one capability, one recorded decision. Applied to an agent, that fits on a page, and it is already more than the 85% in the survey hold.
The figure that reframes the debate
In the same survey, 92% of enterprises with agents in production report keeping or growing their workforce, and a person still decides or verifies in at least 87% of cases at every stage, while AI now leads 40% of decisions. In other words, putting agents in production does not remove human work, it moves it towards decision and control. That is exactly where the loop has to be governed, and it has been the framework's bet since its first edition.
Sources
Frequently asked questions
Why do agents in production produce no measurable value?
Because the chain was implemented without its two ends: no Intent written at the start, hence no indicator, and no Learning component at the finish, hence no revision. The agent runs, and nobody knows what it changes.
What has to be written before deploying an agent?
Three artefacts: a one-sentence Intent with a single indicator, an entry in the agent registry (owner, scope, rights, review date), and a recorded baseline. That last one cannot be recovered after go-live.
How does TEAF measure the gap between intent and execution?
Through two indicators: IVG, which says whether the intent still holds, and IDA, which quantifies what the gap has cost. They turn Observation into data the Learning component can use, rather than a technical dashboard.
Is the full loop needed to start?
No. The 1-1-1 principle of TEAF Light is enough to close the chain on a first scope: one Intent, one capability, one recorded decision. Applied to an agent, it fits on a page.
Do agents in production reduce headcount?
The available self-reported data does not show it: in the November 2026 survey, 92% of the enterprises concerned report keeping or growing their workforce, and a person still decides or verifies in at least 87% of cases. The work moves towards decision and control.
Related reading
Does this challenge sound familiar?
A first conversation to assess it together, at no cost.